well, with 155 miles on the odometer, I figured the Cube was ready to be bagged.
I went with a 4 gallon chrome tank, 2 Viair 400 compressors, 1/2" ODE valves, and 1/2" line.
The rear was pretty straight forward other than having to delete the spare tire and the rear muffler... whoops. But I still have a fully functioning trunk.
The rear is done at this point, the front is waiting for camber plates.
Check out the pics below:
Thanks to VT Kustoms, RMS, Yelosub, and Just1n for all of their efforts. And by efforts I mean beer.
Heres a teaser vid:
http://vids.myspace.com/index....32225
Front end this week?